German civil engineering firm SETREO served as a logistics partner for the DolWin4 (and BorWin4) grid connection systems. SETREO’s scope included surveying heavy transport routes associated with the 155 km underground cable corridor, preparing logistics concepts and feasibility studies, and providing consulting support including VEMAGS test applications.