Powersystems was awarded and completed a design contract to design the 320 kV HVDC onshore cable route and the 400 kV cable route for Dogger Bank Wind Farm phases A and B, which connect from the landfall point at Ulrome to the onshore converter stations south of Beverley and onward to National Grid’s Creyke Beck substation.