Naxos Thira Interconnection – Subsea Cable Laying & Protection; single circuit 150kV AC Submarine and Optical Cables System; selected submarine cable route approximately 82,500m; Asso scope included Marine Survey, PLGR, route clearance, trenching, jetting, ROV survey, etc.
Asso carried out subsea campaign works for the Naxos–Thira (Santorini) 150 kV AC submarine and optical cable system under Cyclades Phase D. Asso’s scope included marine survey activities, pre-lay grapnel run, route clearance, pre-lay mattress installation, cable burial works using mechanical trenching and jetting, post-lay burial, ROV survey, and installation of protection elements (e.g., cast iron shells, sub-ducts, and rock bags) along the subsea route.