"Paros – Naxos – Mykonos Interconnection (Greece) -Subsea Cable Laying & Protection" [10] combined with IPTO description "Paros - Naxos connection with a submarine tripolar cable with a length of 7.6 km." [3]
Asso.subsea acted as a subsea installation contractor for the Paros–Naxos–Mykonos interconnection, undertaking submarine cable laying and protection works. For the Paros–Naxos section, Asso.subsea installed and protected the 150 kV tripolar submarine power cable of approximately 7.6 km route length that closes the loop between Paros and Naxos as part of Cyclades Interconnection Phase B. Its scope was focused on construction‑phase activities such as offshore cable laying and seabed protection, working under contract to the main cable supplier and/or IPTO.