Paros - Naxos connection with a submarine tripolar cable with a length of 7.6 km. Naxos - Mykonos connection with a submarine tripolar cable with a length of 40 km.
Asso.subsea carried out subsea cable laying and protection for the Paros–Naxos–Mykonos interconnection in Greece under Phase B of the Cyclades Interconnection. Its scope included offshore installation and burial/protection of the 150 kV HVAC tripolar submarine cable on the Naxos–Mykonos route, approximately 40 kilometres in length. The company executed the marine installation and seabed protection works needed to secure the interconnector, supporting IPTO’s project to reinforce the Cyclades transmission network and provide secure high-voltage supply to Naxos and neighbouring islands.