Positive
Project advancing - milestone achieved
High Impact
Major milestone or critical setback
HOPS completed the replacement of the 110 kV submarine cable on the Krk–Lošinj line for the Cres (Osor 1) – Lošinj (Osor 2) section under the NPOO programme, and the new cable was put into operation in May 2024 after all necessary tests, measurements and technical inspections were carried out. A formal usage permit for this connection was subsequently obtained on 26 July 2024, confirming its full operational status within the Croatian transmission network.