SETREO acted as logistics partner for the DolWin4 and BorWin4 offshore grid connection systems, including surveying heavy transport routes for the underground cable corridor (stated as 155 km), preparing logistics concepts and feasibility studies, and providing consulting support (including VEMAGS test applications).