FoundOcean provided pile grouting services to secure the four-legged jacket foundation for the Alstom Haliade 150-6 MW test turbine at the Belwind II wind project. The work used BASF Masterflow 9500 grout (reported total material 237 tonnes) and was carried out in 2013 as part of installing the jacket foundation for the demonstration turbine.