CG Holding carried out operations and maintenance support for Belwind’s electrical infrastructure used by the Haliade demo turbine via the Belwind offshore grid, including statutory inspections and condition checks of MV/HV equipment (e.g., thermal imaging and ultrasonic inspections). CG also maintained SCADA systems and IT infrastructure as part of planned maintenance activities on the offshore high voltage station and booster station.