ZRB Janicki was responsible for the horizontal directional drilling (HDD) landfall works near Ustka for the Bałtyk 2 (and Bałtyk 3) onshore connection corridor. The HDD drilling enabled trenchless installation of the export cable section from sea to shore as part of the onshore cable route construction.