Hitachi Energy built two onshore power substations in Pęplino near Ustka as part of the onshore power infrastructure for the Bałtyk 2 and Bałtyk 3 projects. Hitachi Energy also manufactured a significant part of the advanced substation equipment at its facilities in Łódź.