NBO to supply 66 kV inter-array cables, total length ~170 km, for Baltica 2.
Orient Cable (NBO) was contracted to supply the Baltica 2 inter-array (array) submarine cable system. The scope covered delivery of 66 kV inter-array cables with a total length of approximately 170 km, intended to connect the wind turbines to the offshore substations.