PGE Baltica selected Gavin and Doherty Geosolutions (GDG), part of the Venterra Group, as the geotechnical and construction designer for the seabed/ground survey stage of the Baltica 1 offshore wind farm (EWB1). GDG’s scope covered supervising the subsoil exploration works using geophysical and geotechnical methods in the future wind farm area and along the offshore export cable route, developing a subsoil/ground model, and delivering a conceptual foundation design to support subsequent design stages.