Positive
Project advancing - milestone achieved
High Impact
Major milestone or critical setback
By the time of the 2014 European Commission state aid decision, the Andros–Tinos 20 kV interconnector was already in regular operation, with the 150/20 kV substation on Andros feeding Tinos Island at the medium-voltage 20 kV level, indicating that the local distribution link between the two islands was fully commissioned and in commercial service.