SOC awarded installation of the 33 kV inner array grid cables (reported total length up to ~86 km) plus associated services including route survey/engineering, route clearance, termination and testing; project reporting indicates ~100 km of array cables laid.
Siem Offshore Contractors GmbH (SOC) was awarded a contract by Amrumbank West GmbH for the installation of the wind farm’s 33 kV inner array grid (inter-array) submarine cables and associated services. SOC’s scope included subsea cable installation works and supporting activities such as marine cable route survey and engineering, route clearance operations, and post-installation termination and testing for the inter-array cable system.