JD-Contractor A/S installed the original 1997 power cable between Agersø and Omø for SEAS-NVE, per its published reference list entry: Denmark, 15 kV, 1,700 metres, 1997, Power Cable, Agersø-Omø, client SEAS-NVE. This was the inter-island submarine cable segment that was subsequently replaced by the 2012 NKT Cables 12 kV cable campaign. Scope was marine cable embedment / burial on the seabed between the two Danish islands. Source: JD-Contractor A/S company reference list (jdcon.dk/References/Cable-Embedding).