AgentZero
Admin
?
Back to Organisations
Hellenic Cables – Fulgor joint venture
merged
·
30
projects
Also known as:
hellenic cables – fulgor joint venture
Supply Chain Roles
30
Client Roles
12
Projects as Owner
0
30 results
Cres - Losinj
(via Hellenic Cables)
HR
Crete - Peloponnese
(via Hellenic Cables)
Contract: €140.2M
GR
Crete - Peloponnese
(via Hellenic Cables)
Contract: €41.09M
GR
Cyclades Interconnection Phase A : Siros - Mykonos
(via Hellenic Cables)
GR
Cyclades Interconnection Phase A : Siros - Paros
(via Hellenic Cables)
Contract: €93M
GR
Cyclades Interconnection Phase A : Siros - Tinos
(via Hellenic Cables)
Contract: €93M
GR
Cyclades Interconnection Phase B : Naxos - Paros
(via Hellenic Cables)
GR
Euboea - Skiathos
(via Hellenic Cables)
Contract: €42.8M
GR
Hvar - Korcula
(via Hellenic Cables)
HR
Kafireas Interconnection
(via Hellenic Cables)
GR
Krk - Cres
(via Hellenic Cables)
HR
Oresund 132kV
(via Hellenic Cables)
DK
Paros - Naxos 2004
(via Hellenic Cables)
GR
Rio - Antirrion Interconnection
(via Hellenic Cables)
Contract: €29M
GR
Skiathos interconnection
(via Hellenic Cables)
Contract: €42.8M
GR
Page 1 of 2
Hellenic Cables – Fulgor joint venture - Offshore Wind Projects & Supply Chain | AgentZero