Fred Olsen’s wind turbine installation vessel “Brave Tern” installed the first of the 70 offshore wind turbines at the Wikinger offshore wind farm. Turbine components were pre-assembled at Mukran Port (Sassnitz, Rügen) and loaded onto Brave Tern in sets of three turbines for offshore installation and commissioning.