two underwater cables connecting with Lubmin onshore substation were installed and commissioned in coordination with 50Hertz / jointly installed and commissioned the underwater cables to Lubmin onshore substation
German transmission system operator 50Hertz worked jointly with Iberdrola to install and commission the two underwater export cable links connecting the Wikinger offshore wind farm to the Lubmin onshore substation, enabling connection of the project to the national grid.