Bibby Hydromap conducted marine survey work along the preferred Western Isles Connection Project subsea cable route corridor, with surveys undertaken in 2016 (May–June) to acquire geophysical, geotechnical and environmental data and support route viability assessment and installation/protection method selection. Subsequent Bibby Hydromap survey work in 2017 was referenced in project studies assessing seabed features along the proposed route.