Transport and install 42.5 km of 33 kV inter-array cables at Westermost Rough.
Technip Offshore Wind executed an offshore inter-array cable installation contract for the Westermost Rough offshore wind farm, awarded by DONG Energy. Technip’s scope was to transport and install around 42.5 km of 33 kV inter-array cables, with offshore operations starting in June 2014 and installation planned to conclude in the second half of 2014.