PDL Group was contracted by Technip Offshore Wind Ltd to deliver OrcaFlex dynamic analysis to underpin and validate Technip’s inter-array cable installation procedures for the Westermost Rough development. The work supported construction-phase installation engineering, including pull-in analysis to monopiles and the offshore substation and optimisation of installation parameters to minimise cable and cable protection system damage.