Nexans supplied approximately 53 km of medium-voltage submarine cables / inter-array cabling for Westermost Rough (33/34 kV).
Nexans supplied the Westermost Rough wind farm with medium-voltage submarine inter-array cables. The supply was for the project’s 33/34 kV inter-array cable system connecting the turbines to the offshore substation. Sources described the supplied length as approximately 53 km of medium-voltage submarine cable for the wind farm.