CG Electrical Systems Hungary was engaged by Westermost Rough Limited to supply and install the main power transformers on the offshore substation platform for the Westermost Rough transmission assets. Its contract covered two 150/34 kV, 140 MVA transformers that step up power from the wind farm’s 34 kV collection system to the 150 kV export level. These transformers are integral to the offshore HVAC substation that forms part of the regulated Westermost Rough OFTO asset base.