Offshore WindForce (OWF), a 50/50 joint venture between Boskalis Offshore and Volker Stevin Offshore, was awarded the scour protection and foundation transport and installation scope for the West of Duddon Sands Offshore Wind Farm. OWF managed logistics and mobilisation and executed the installation of the 108 monopile foundations and transition pieces, including installation-related secondary steel and associated engineering (including finite element calculations) for installation works and scour protection works around the foundations.