Siemens AG was selected by DONG Energy to supply 7.0 MW direct-drive wind turbines for the second phase of the Walney Extension offshore wind farm. The final project configuration described 47 turbines of the Siemens Gamesa SWT-7.0-154 type within the overall 87-turbine wind farm.