installation of 87 inter-array cables; route engineering, pre-lay grapnel run, cable transport, cable installation and trenching
VBMS was awarded a contract by DONG Energy to install the inter-array (inter-turbine) cables at the 660 MW Walney Extension offshore wind farm. VBMS’ scope included route engineering, pre-lay grapnel run, cable transport, cable installation and trenching using VBMS’ cable-laying vessels and trenching tools. The award followed a re-allocation of the inter-array cable installation contract previously awarded to CT Offshore.