install 87 inter-array cables
CT Offshore signed an agreement with DONG Energy to install the inter-array (inter-turbine) cable system at the Walney Extension offshore wind farm. The stated scope was installation of 87 inter-array cables, with work planned to begin in spring 2017 using the cable-laying vessel SIA.