Walney II contractors included ... Draka Norsk Kabel (DNK) for installing the inter-array cables
Draka Norsk Kabel (DNK) carried out installation of the inter-array cables for Walney II (Walney 2), as part of the wind farm’s infield electrical system connecting turbines to the offshore substation.