Operations and maintenance support for the 132 kV HVAC export cable between the Walney II offshore substation and the onshore grid connection at Stanah, including subsea and nearshore sections.
In 2017, RES (Renewable Energy Systems) was awarded a 15‑year operations and maintenance contract by Blue Transmission Walney 2 Limited (BTW2L) for the Walney 2 offshore transmission asset. The long-term O&M agreement covers the OFTO infrastructure, including the offshore substation and associated 132 kV export cable system transmitting power from the Walney II wind farm to the onshore grid. RES’ scope includes planned and unplanned maintenance, 24/7 control room services, rapid response to faults, and provision of offshore logistics, supporting the operational reliability and availability of the Walney 2 OFTO over its regulated revenue period.