Walney 1 cable landfall/intertidal pull-in and burial of 132 kV export cable at Heysham
Visser & Smit Hanab carried out the intertidal landfall works for the Walney 1 export cable, including coordination and pulling the HV export cable ashore at the southern side of the Port of Heysham. The scope included engineering the landfall interface, coordinating offshore and onshore activities, pulling in the HV cable from the cable-lay vessel Stemat Spirit into the joint bay, and burial of the near-shore section to the required depth.