Transportation and installation (laying and burial) of 44 km and 43 km 132 kV export cables in two routes; Walney 1 activities from April 2010
Seabed Power was awarded a contract by Dong Energy for transportation and installation (laying and burial) of the 132 kV export cable for the Walney offshore wind farm, with activities stated to commence in April 2010 for Walney 1. Sources report two export-cable routes of 44 km and 43 km for the overall Walney project; the Walney 1 OFTO export link corresponds to one of these routes.