CS WIND Offshore lists Walney 1 & 2 as a reference project in which it fabricated two offshore substations and their jacket structures for client Ørsted. For Walney 1 this covered fabrication of the offshore substation topside and jacket that form part of the Walney 1 OFTO transmission assets, delivered during the 2010–2011 construction period alongside the companion platform for Walney 2.