Fixed gravity foundations on Gässlingegrundet (lake-based).
Fixed gravity foundations supporting WinWinD WWD-3 (3 MW) turbines at Gässlingegrundet (Lake Vänern). Some sources have previously reported 7 turbines, but the majority indicate 10 × 3 MW (30 MW total).
1 Cost inflated in local currency then converted to euros (where applicable).
The Vindpark Vänern wind farm, a 10‑turbine, 30 MW project in Lake Vänern, is reported as operating since 2010, indicating that the associated export connection and transmission assets to shore were fully commissioned and in commercial operation from that year.