Awarded contracts for HDD works, trenching installation and joint bay construction on behalf of Balfour Beatty for the 67 km UK cable route; included ~98 HDDs, 60 km of trenching and 58 joint bays.
Subcontracted by Balfour Beatty to perform horizontal directional drilling (HDD), trenching and joint‑bay construction along the UK onshore cable route. Works included circa 98 HDDs, approximately 60 km of trenching and construction of 58 joint bays as part of the construction phase.