Responsible for onshore cable installation in Denmark from the west coast landfall to the Revsing HV substation.
Contracted to install the Danish onshore cable section between the Blåbjerg/Houstrup landfall and the Revsing converter/substation, carrying out the onshore installation works for the Danish side of the interconnector during construction.