Responsible for the civil engineering and installation of 68 kilometres of high voltage cabling across Lincolnshire connecting the landfall to the Bicker Fen substation.
Four‑year civil engineering and onshore cable installation contract in the UK to deliver the onshore cable route between the Lincolnshire landfall and the Bicker Fen converter/substation. Scope comprised civil works and installation of high‑voltage land cables across the UK route during construction.