AgentZero
Admin
?
Vareide - Midtsundstad - HVAC - Interconnector | Norway | AgentZero
Back to Projects
Vareide - Midtsundstad
Operational
Crossing
132 kV
2.1 km
Basic information
6 fields
Status
operational
Owners
Lofotkraft
100%
Project Company
Lofotkraft AS
SPV
Type
crossing
Expected Life
50
years
Website
lofotkrafta.no
Supply Chain (0)
Table
Tree
Quilt
Project Timeline (0)
Newest
Timeline
Table
Gantt
No lifecycle events recorded yet.
System Topology
Interconnector
React Flow
Press enter or space to select a node. You can then use the arrow keys to move the node around. Press delete to remove it and escape to cancel.
Press enter or space to select an edge. You can then press delete to remove it or escape to cancel.
Show more
Route
Norway - Norway · 2 fields
Norway
Norway
Landfall
Vareide, Flakstad, Norway
Midtsundstad, Flakstad, Norway
Grid Connection
—
—
Norway
Landfall:
Vareide, Flakstad, Norway
Grid:
—
Norway
Landfall:
Midtsundstad, Flakstad, Norway
Grid:
—
Cable Specifications
7 fields
Vareide - Midsundstad Cable
Vareide, Flakstad, Norway → Midtsundstad, Flakstad, Norway
1 × 132 kV HVAC · copper 400 mm² · XLPE (Cross-linked Polyethylene) · 2.1 km
System:
1 × 132 kV HVAC
Construction:
copper
·
400 mm²
Insulation:
XLPE (Cross-linked Polyethylene)
Route length:
2.1 km
(2.1 subsea · 0 land)
Burial depth:
Project documents describe protection and burial of the sea cables at all landfalls, with jetting (down-ploughing) to approximately 0.7 m burial depth down to about 30 m water depth, and...
Read more
Collector Stations
(2)
0 fields
Substation (NO 1)
Norway
Substation (NO 2)
Norway