Supply contract for a dynamic power cable and grid connection for the TetraSpar full-scale floating wind turbine demo; Zefyros chosen as connection point (hub) to the onshore grid.
UNITECH Offshore AS signed a supply contract with the TetraSpar Demonstrator Project to provide a dynamic power cable and the associated grid connection solution for the full-scale floating wind turbine demonstrator planned outside Karmøy (2020). The FWT Zefyros (former Hywind Demo / Unitech Zefyros) was selected as the connection point (hub) to the onshore grid, enabling the demonstrator to feed power through Zefyros’ existing grid interface rather than installing a new export cable to shore.