Tyrrhenian Link 500 kV HVDC bipolar interconnector between Sicily, Sardinia and Campania, approximately 970 km total route with subsea and onshore sections.
Roda was identified as an associated partner in Terna’s framework contract with Prysmian Group and Nexans for the Tyrrhenian Link subsea and underground cable works. Within this association, Roda is linked to the design, installation and commissioning scope for the interconnector’s cable system, supporting the main contractors on construction activities for both subsea and land cable sections, including onshore cable routes connecting the landfalls to the converter stations. Its role is tied to the construction phase of the Tyrrhenian Link, assisting in delivery of the HVDC cable infrastructure between Sardinia, Sicily and Campania.