Fugro was selected by Terna SpA to perform a multidisciplinary route survey for the East Link section of the Tyrrhenian Link HVDC interconnector between Campania and Sicily. Fugro’s scope included a reconnaissance multibeam survey followed by a detailed marine geophysical survey using ROVs and specialist teams to acquire geo-data and provide geohazard risk mitigation advice to support selection of the final cable installation routes.