Equinor, on behalf of the Troll partners, awarded Aker Solutions a front-end engineering and design (FEED) contract to mature the topside modification scope required to receive electrical power from shore at the Troll B and Troll C platforms as part of the Troll West electrification project. The FEED covered planning of large and complex offshore modification work to accommodate power-from-shore and included an option for Equinor to exercise engineering, procurement, construction and installation (EPCI) following final investment decision.