Terminations and testing of the 66KV Inter Array Cables in the 90 WTG structures and 2 Offshore Substations
Reynard (previously V&SH Offshore) performed array cable terminations and testing at Triton Knoll Offshore Wind Farm. The scope included preparation, completion, termination and testing of high-voltage and fibre-optic connections of the 66 kV inter-array cables within the 90 wind turbine generator structures and at the project’s two offshore substations, following installation of the inter-array cables in 2020.