Cable termination and testing on the 90 wind turbines; installation and termination of high voltage cables between offshore foundations and turbine switchgear
EDS HV Group (part of James Fisher and Sons plc) was awarded a cable termination and testing contract at Triton Knoll covering the wind farm’s turbines. The scope involved installation, termination and testing work for high-voltage cables between offshore foundations and turbine switchgear, including pre-testing, mock-up trials and cable preparation undertaken in late 2020.