Able UK provided Seaton Port (Teesside) as the location for MHI Vestas’ full-scale turbine pre-assembly operation for Triton Knoll, covering enabling works through loadout. Able UK was to develop additional heavy-duty quayside and invest in equipment and facilities at Seaton Port to support delivery of the Triton Knoll offshore wind farm.