Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
From 19 to 23 September 2019 a post-construction benthic survey was conducted over the Thanet Offshore Wind Farm, using grab sampling and drop-down video to assess long-term changes in benthic ecology compared with 2005 baseline and 2012 post-construction surveys.