AgentZero
Admin
?
Southern Aegean Interconnector - 800 MW - HVDC - Interconnector | GR | AgentZero
Back to Projects
Southern Aegean Interconnector
Generation Export
GR
800 MW
Basic Information
Also known as:
Southern Aegean Interconnector, SAI, Southern Aegean Interconnector (local island segment), Νότιο Αιγαίο Διασύνδεση
Capacity:
600–800 MW
Owners:
KYKLADIKA MELTEMIA S.A.
(100%)
Project Company:
KYKLADIKA MELTEMIA S.A.
Type:
generation export
Cable Specifications
South Aegean: Levitha-Kounoupoi/Makra Anafi/Megalo Sofrano Cable
HVDC · XLPE (Cross-linked Polyethylene) · 245 km subsea
System:
HVDC
Insulation:
XLPE (Cross-linked Polyethylene)
Route length:
245 km subsea
Supply Chain (0)
Table
Tree
Quilt
Project Timeline (0)
Newest
Timeline
Table
Gantt
No lifecycle events recorded yet.
Collector Stations
Substation (GR 1)
GR
Substation (GR 2)
GR