Supply around 360 km of 66 kV inter-array cables and accessories; design, engineer, manufacture, test and supply
Hellenic Cables (the cable segment of Cenergy Holdings) was awarded a contract by Van Oord to supply around 360 km of 66 kV XLPE-insulated inter-array cables and accessories for the Sofia Offshore Wind Farm. Hellenic Cables’ scope covered design and engineering, manufacturing, testing and supply of the inter-array cables and associated accessories, with production planned to run through 2022–2023.