Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
SSEN Transmission contracted Hitachi Energy to supply the HVDC technology and main circuit apparatus and systems for the Shetland HVDC Link, including the equipment enabling the multi‑terminal operation that connects the new Kergord converter station in Shetland to the Noss Head switching station and into the existing Caithness–Moray HVDC system. Hitachi Energy’s HVDC Light platform and associated grid integration systems form the core of the project’s converter and switching infrastructure.