Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
In July 2025, Ofgem published its Clean Power 2030 (CP2030) ‘minded to’ position, confirming the need for proposed on-island transmission infrastructure on Shetland to connect current and future requirements associated with the Shetland Strategy and the planned Shetland HVDC Link 2. This indicative regulatory decision signals support for the required Shetland onshore network that will interface with the second HVDC link.